Shiki42/PutCab-AB-IdleFix5-Preview
E098 smooth-motion preview: five completed samples This refresh contains five physically qualified samples from the current full50 simulation generation. Close-to-motion boundaries use C2 transitions with analytic acceleration <=3rad/s² and jerk <=100rad/s³ within repaired intervals. It retains the compacted idle handling and14cm drawer gate with0.3s stability. All three camera videos are320×240 H.264 at50/3FPS, physics250Hz. Open in LeRobot visualizer Total:5 episodes, 1192… See the full description on the dataset page: https://huggingface.co/datasets/Shiki42/PutCab-AB-IdleFix5-Preview.
| Author / organization | Shiki42 |
|---|---|
| Downloads | 127 (as reported by Hugging Face) |
| Likes | 0 |
| Created | 9 September 2026 |
| Last updated at source | 9 September 2026 |
Popularity, last 2 days
127 now (-7 since 2026-10-16). Counts as reported by the source, snapshotted daily by Silytics.
More from Shiki42
- Shiki42/ctr-experiment-evidence-pro-790182b14f35-20261005Dataset
- Shiki42/ctr-experiment-evidence-pro-7901d0dfa49c-20261005Dataset
- Shiki42/piperx-screw-0910-25ep-ctr-preview-checkDataset
- Shiki42/PutCab-CTR-Train50-V4Dataset
- Shiki42/PutCab-Concurrent-Train50-V4Dataset
- Shiki42/PutCab-Mixed-Train50-V4Dataset
Silytics shows public metadata from Hugging Face and links to the original. Information may be incomplete or out of date. Last refreshed 17 October 2026. Licenses and terms of the original apply to the work itself. Not financial, legal or professional advice.