Sign inGet started
Paper · arXiv

How Early Is Early Enough? Design-Dependent Observation-Window Sufficiency in Subscription Churn Prediction

How many days of early behavior suffice for subscription churn prediction? In the public KKBox dataset, the early indicator of churn is typically an indicator of someone's contract status; however, when looking in the heavily churned manual-renewal segment, having access to early behavior creates a substantial increase in prediction for that specific segment (PR +0.10 at 120 days). A nine-window sufficiency curve shows diminishing returns; descriptive inflection detectors place a knee between 30 and 120 days depending on the metric and model class. Stress-testing over three cohort/task designs shows that this curve is singular to the design being tested; for example, in our test with a mo...

AuthorsXiao Han, Yao Xiao, Chenyu Wu et al.
Primary categorycs.LG
Published1 July 2026
Last updated at source21 September 2026
cs.LG
Embed this entry
<iframe src="https://silytics.si/embed/item/bfb53936-7a6a-4634-aa0a-387f4cf34534" width="420" height="190" style="border:0" loading="lazy" title="Silytics entry"></iframe>

Free, no tracking. More about feeds and embeds.

Silytics shows public metadata from arXiv and links to the original. Information may be incomplete or out of date. Last refreshed 17 October 2026. Licenses and terms of the original apply to the work itself. Not financial, legal or professional advice.