Sign inGet started
Paper · arXiv

Graph-RHO: Critical-path-aware Heterogeneous Graph Network for Long-Horizon Flexible Job-Shop Scheduling

Long-horizon Flexible Job-Shop Scheduling~(FJSP) presents a formidable combinatorial challenge due to complex, interdependent decisions spanning extended time horizons. While learning-based Rolling Horizon Optimization~(RHO) has emerged as a promising paradigm to accelerate solving by identifying and fixing invariant operations, its effectiveness is hindered by the structural complexity of FJSP. Existing methods often fail to capture intricate graph-structured dependencies and ignore the asymmetric costs of prediction errors, in which misclassifying critical-path operations is significantly more detrimental than misclassifying non-critical ones. Furthermore, dynamic shifts in predictive c...

AuthorsYujie Li, Jiuniu Wang, Mugen Peng et al.
Primary categorycs.LG
Published11 April 2026
Last updated at source11 April 2026
cs.LGcs.AI
Embed this entry
<iframe src="https://silytics.si/embed/item/78e1e323-7bbd-48ed-a22e-90d048296e6b" width="420" height="190" style="border:0" loading="lazy" title="Silytics entry"></iframe>

Free, no tracking. More about feeds and embeds.

Silytics shows public metadata from arXiv and links to the original. Information may be incomplete or out of date. Last refreshed 17 October 2026. Licenses and terms of the original apply to the work itself. Not financial, legal or professional advice.