Sign inGet started
Paper · arXiv

Learning Memory-Enhanced Improvement Heuristics for Flexible Job Shop Scheduling

The rise of smart manufacturing under Industry 4.0 introduces mass customization and dynamic production, demanding more advanced and flexible scheduling techniques. The flexible job-shop scheduling problem (FJSP) has attracted significant attention due to its complex constraints and strong alignment with real-world production scenarios. Current deep reinforcement learning (DRL)-based approaches to FJSP predominantly employ constructive methods. While effective, they often fall short of reaching (near-)optimal solutions. In contrast, improvement-based methods iteratively explore the neighborhood of initial solutions and are more effective in approaching optimality. However, the flexible ma...

AuthorsJiaqi Wang, Zhiguang Cao, Peng Zhao et al.
Primary categorycs.LG
Published3 March 2026
Last updated at source3 March 2026
cs.LGcs.AI
Embed this entry
<iframe src="https://silytics.si/embed/item/7d62f778-fe89-4895-a108-2a97a5c9ab13" width="420" height="190" style="border:0" loading="lazy" title="Silytics entry"></iframe>

Free, no tracking. More about feeds and embeds.

Silytics shows public metadata from arXiv and links to the original. Information may be incomplete or out of date. Last refreshed 17 October 2026. Licenses and terms of the original apply to the work itself. Not financial, legal or professional advice.