JCB2/WAN 2.2 5b i2v Workflow
WAN 2.2 5B Workflow A workflow for WAN 2.2 5B with multiple improvements for speed, flexibility, and usability: Auto resolution calculator – automatically adjusts resolution based on a maximum dimension. Video length in seconds – define duration in seconds instead of frames. Fast interrupt – integrates BlehModelPatchFastTerminate to stop WAN generations more quickly. FastWan LoRA – accelerates sampling. Recommended settings: steps = 4–6, CFG = 1.0. Taew2.2 Preview – extremely fast (~1s) preview decode to check quality before running the slower wan2.2_vae . 2-Step Process – first run generates
| Author / organization | JCB2 |
|---|---|
| Downloads | 10.6K (as reported by Civitai) |
| Likes | 300 |
| Task | text-to-image |
| Created | 3 October 2025 |
| Last updated at source | — |
Popularity, last 2 days
10,627 now (+13 since 2026-10-15). Counts as reported by the source, snapshotted daily by Silytics.
More from JCB2
Silytics shows public metadata from Civitai and links to the original. Information may be incomplete or out of date. Last refreshed 16 October 2026. Licenses and terms of the original apply to the work itself. Not financial, legal or professional advice.